West Edmonton Mall Toyota

Toyota Prius hybride branchable 2026

2601202 | XSE



Specifications

Year:

2026

Odometer:

0 km

Transmission:

Automatic

Drivetrain:

FWD

Engine:

4 Cylinders

Engine (L):

2.0

Fuel:

Plug-In Hybrid

Exterior color:

Wind Chill Pearl (0089)

Doors:

4

Interior color:

AB PKG

Stock number:

2601202

VIN:

JTDACACU2T3075415


Description

This 2026 Toyota Prius Plug-In Hybrid is available at West Edmonton Mall Toyota in Edmonton. At West Edmonton Mall Toyota, buying and servicing your vehicle is designed to be as convenient and enjoyable as possible. Located inside the world-famous West Edmonton Mall in Edmonton, our dealership offers an automotive experience unlike any other. While your vehicle is being serviced, you can shop, grab a coffee, meet friends for lunch, or simply enjoy everything the mall has to offer. It transforms routine vehicle maintenance into time well spent.

As a full-service Toyota dealership, we provide a complete range of automotive services under one roof. From the latest new Toyota vehicles and high-quality pre-owned inventory to expert factory-trained service technicians and genuine Toyota parts, every part of your ownership experience is handled with care and precision. Our team understands the demands of driving in Northern Alberta, and we are committed to helping you choose and maintain a vehicle that performs confidently in every season.

West Edmonton Mall Toyota is also built around convenience. Our service department is designed for efficiency, our parts department is fully stocked, and our team works hard to ensure every visit is smooth and straightforward. Customers appreciate the ability to combine everyday errands, entertainment, and vehicle care all in one place.

What truly sets us apart is the environment. The energy of the mall, the accessibility of our location, and the commitment of our team create a dealership experience that is welcoming, modern, and customer-focused. It’s not just about selling vehicles — it’s about making ownership easy.

For drivers across Edmonton and Northern Alberta, West Edmonton Mall Toyota isn’t simply another dealership. It’s the most convenient, enjoyable, and logical place to purchase and service your vehicle.

Options

  • 1 12V DC Power Outlet and 1 Interior 120V AC Power Outlet
  • 1 12v dc power outlet
  • 1 seatback storage pocket
  • 2 LCD Monitors In The Front
  • 4.11 Axle Ratio
  • 40 L Fuel Tank
  • 6 Speakers
  • 60-40 Folding Bench Front Facing Heated Fold Forward Seatback Rear Seat
  • ABS And Driveline Traction Control
  • AIR CONDITON EXCSE TAX
  • AMVIC FEE
  • AND ETA ARE SUBJECT TO
  • APX 00
  • Air Filtration
  • Airbag Occupancy Sensor
  • Auto On/Off Projector Beam Led Low/High Beam Daytime Running Auto High-Beam Headlamps w/Delay-Off
  • Back-Up Camera
  • Battery w/Run Down Protection
  • Black Grille
  • Black power heated side mirrors w/manual folding
  • Black side windows trim and black front windshield trim
  • Black wheel well trim
  • Blind spot monitor
  • Body-Coloured Door Handles
  • Body-Coloured Front Bumper w/Black Rub Strip/Fascia Accent and Metal-Look Bumper Insert
  • Body-Coloured Rear Bumper w/Black Rub Strip/Fascia Accent
  • Brake Actuated Limited Slip Differential
  • CHANGE AFTER 30 DAYS
  • CROSS BARS AND THULE
  • Cargo Area Concealed Storage
  • Cargo Space Lights
  • Cargo features -inc: tire mobility kit
  • Carpet Floor Trim
  • Collision Mitigation-Front
  • Cruise Control w/Steering Wheel Controls
  • Curtain 1st And 2nd Row Airbags
  • DELIVERY & DESTINATION
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Digital Appearance
  • Drive Connect w/3-Year Trial Real-Time Traffic Display
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination, Driver And Passenger Auxiliary Mirror
  • Driver Foot Rest
  • Driver Information Centre
  • Driver Seat -inc: Power 2-Way Lumbar Support
  • Driver monitoring-alert
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Electric Power-Assist Steering
  • Electronic Stability Control (ESC)
  • Engine auto stop-start feature
  • Evasion Assist
  • FOB Controls -inc: Keyfob Window Activation
  • Fade-To-Off Interior Lighting
  • Fixed Glass 1st Row Sunroof w/Sunshade
  • Fixed Glass 2nd Row Sunroof w/Sunshade
  • Fixed rear window w/defroster
  • Folding cargo cover
  • Front And Rear Anti-Roll Bars
  • Front And Rear Map Lights
  • Front Centre Armrest and Rear Centre Armrest
  • Front Cross Traffic Alert (FCTA)
  • Front Cupholder
  • Front Seats w/Leatherette Back Material and Power 2-Way Driver Lumbar
  • Front and Rear Parking Assist Front And Rear Parking Sensors
  • Front-wheel Drive
  • Full Carpet Floor Covering
  • Full Cloth Headliner
  • Full Floor Console w/Covered Storage, Mini Overhead Console, 1 12V DC Power Outlet and 1 Interior 120V AC Power Outlet
  • Full-Speed Range Dynamic Radar Cruise Control
  • Galvanized steel/aluminum/composite panels
  • Gas-Pressurized Shock Absorbers
  • Gauges -inc: Speedometer, Odometer, Traction Battery Level, Power/Regen, Trip Odometer and Trip Computer
  • HVAC -inc: Underseat Ducts
  • Headlights-Automatic Highbeams
  • Heated SofTex Leatherette Steering Wheel
  • Hybrid Electric Motor
  • Illuminated Glove Box
  • Immobilizer
  • Integrated Roof Antenna
  • Integrated navigation system w/voice activation
  • Interior Concealed Storage, Driver / Passenger And Rear Door Bins
  • Interior Trim -inc: Coloured Instrument Panel Insert, Piano Black Console Insert and Piano Black/Metal-Look Interior Accents
  • LED Brakelights
  • Laminated Glass
  • Lane Departure Alert (LDA) w/Steering Assist Lane Departure Warning
  • Lane Departure Alert (LDA) w/Steering Assist Lane Keeping Assist
  • Liftgate rear cargo access
  • Light Tinted Glass
  • Lithium Ion (li-Ion) Traction Battery w/3.5 kW Onboard Charger, 11 Hrs Charge Time @ 110/120V, 4 Hrs Charge Time @ 220/240V and 13.6 kWh Capacity
  • Low Tire Pressure Warning
  • Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
  • Manual Tilt/Telescoping Steering Column
  • Multi-Link Rear Suspension w/Coil Springs
  • Outboard Front Lap And Shoulder Safety Belts -inc: Rear Centre 3 Point, Height Adjusters and Pretensioners
  • Outside Temp Gauge
  • Passenger Seat
  • Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Power Rear Windows
  • Pre-Collision System (PCS) w/Intersection Support
  • Prius Plug-in Hybrid XSE- Prem
  • Proximity Key For Doors And Push Button Start
  • Radio w/Seek-Scan, Clock, Speed Compensated Volume Control, Steering Wheel Controls, Radio Data System and External Memory Control
  • Rear Child Safety Locks
  • Rear Cross Traffic Alert (RCTA)
  • Rear Cupholder
  • Rear Side-Impact Airbag
  • Regenerative 4-Wheel Disc Brakes w/4-Wheel ABS, Front Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
  • Remote Connect Selective Service Internet Access
  • Remote Keyless Entry w/Integrated Key Transmitter, Illuminated Entry, Illuminated Ignition Switch and Panic Button
  • Remote Releases -Inc: Power Fuel
  • SHOWROOM CLEAN
  • Safety Connect w/up to 10-year trial Emergency Sos Capability
  • Safety Connect w/up to 10-year trial Tracker System
  • Side Impact Beams
  • Single Stainless Steel Exhaust
  • Smart Device Remote Engine Start
  • Smart device integration
  • SofTex/Fabric Seat Trim
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers
  • Strut Front Suspension w/Coil Springs
  • Tailgate/Rear Door Lock Included w/Power Door Locks
  • Tire mobility kit
  • Tires: P195/50R19
  • Transmission w/driver selectable mode
  • Transmission: Continuously Variable (eCVT)
  • Trip Computer
  • Turn-by-turn navigation directions
  • Urethane gear shifter material
  • VEH PRICE/FINANCE RATE
  • Voice Activated Automatic Air Conditioning
  • Wireless Phone Connectivity

Are you interested in this vehicle? Don’t stop there, take the next step!

Let yourself be tempted, book a test drive today.

Book a test drive

Recommended similar vehicles

2025 Toyota Prius Plug-In Hybrid 2025 White

Toyota Prius Plug-In Hybrid 2025

$49,986

2025 Toyota Prius Plug-In Hybrid 2025 White

Toyota Prius Plug-In Hybrid 2025

$49,986

2026 Toyota Camry 2026 Wind Chill Pearl

Toyota Camry 2026

$50,509

2026 Toyota Camry 2026 Wind Chill Pearl

Toyota Camry 2026

$50,509

2026 Toyota Prius Plug-In Hybrid 2026 Wind Chill Pearl

Toyota Prius Plug-In Hybrid 2026

$52,174

2025 Mercedes-Benz GLA 250 2025 gray

Mercedes-Benz GLA 250 2025

$53,986

  • Finance this vehicle

    We have financing plans that are tailored to each individual situation. Contact us for your personalized plan!




    • Trade-in for this vehicle

      We want your old vehicle! Contact us so we can offer you a competitive price for your trade-in.




      • Test drive this vehicle

        Book a test drive with us to try this vehicle before buying it.




        • Request information about this vehicle

          Do you need additional information on this vehicle? We would be happy to answer your questions as quickly as possible!




          Close

          Evaluate your payments

          Toyota
          2026 Prius Plug-In Hybrid

          2601202 | XSE

          2601202 / VIN: JTDACACU2T3075415

          For
          months at
          Mileage
          Cashdown
          Trade-in value
          Lease starting at
          + TX

          + TX

          months

          + LEGAL - LEGAL
          Lease

          For
          months at
          Cashdown
          Trade-in value
          Finance starting at
          + TX

          + TX

          months

          + LEGAL - LEGAL
          Finance

          No payment offers are currently available for this vehicle. Contact us for current promotions.